On-Call Surveying

Kane County Division of Transportation


OBJECTIVE

HLR conducts various land surveying activities for Kane County on an as-needed basis.  Surveys include services such as preparing Plats of Highways, staking right-of-way, and route surveys. 

PROJECT DESCRIPTION

Some of the projects include:


Seavey Road Maintenance Facility:

  • Conducted a boundary survey of the 29-acre maintenance facility in Blackberry Township.
  • The survey was required for the installation of a chain-link fence around the perimeter.
  • Re-established a section corner and set five corners of the boundary during the survey.
  • Prepared a Plat of Survey for recording to show the location of the new fence.

IL 47 at Burlington Road:

  • Performed an existing right-of-way survey and prepared Plats of Highways and legal descriptions for the proposed roundabout at the intersection.
  • Located property lines and necessary section corners to establish right-of-way from all four quadrants.

Kirk Road at Stadium Street:

  • Conducted a route survey of Kirk Road from Foxfield Road to Fox Chase Drive in St. Charles.
  • The survey was necessary for the widening and resurfacing of Stadium Street.
  • Provided cross sections, located right-of-way and easements, and supplied the digital terrain model with contours for the County's design use.

Burlington Road Spillway Monitoring:

  • In accordance with a commitment to the landowner, the County agreed to monitor the concrete spillway at Burlington Road and Corron Road during construction.
  • Inspected the spillway and recorded its condition before construction.
  • Installed monitoring targets at six locations on the spillway.
  • Conducted weekly monitoring of the targeted locations throughout construction to observe any horizontal or vertical movement in the structure.

Fabyan Parkway at IL 31:

  • Performed an existing right-of-way survey and prepared Plats of Highways and legal descriptions for a land exchange between the County of Kane and the Kane County Forest Preserve District.

Longmeadow Parkway:

  • Conducted various surveying tasks, including supplemental route surveys and right-of-way plats necessary for the acquisition of the Longmeadow corridor.
  • Completed Plats of Highways for the IL 31 intersection and the IL 62 intersection with Longmeadow.

PROJECT HIGHLIGHTS


  • Improved accuracy and knowledge of boundary lines and right-of-way for various project areas
  • Proper documentation and recording of survey data through the preparation of Plats of Survey and legal descriptions
  • Facilitated land exchange agreements between governmental entities, promoting effective land management and resource allocation
  • Efficient acquisition and management of project areas through supplemental route surveys and right-of-way plats

 