City of DeKalb
The project scope includes roadway reconstruction for a roundabout at Lucinda’s intersection with Normal Avenue and resurfacing along the remainder of the project. Project work involves topographic survey, completing the environmental survey request, coordination of the geometric design, review of bicycle and pedestrian accommodations, crash analysis, and preparation of a Project Development Report.
ADA/PROWAG improvements, including multiple mid-block crossings, were incorporated into the project. A rapid rectangular flashing beacon (RRFB) was installed on the east leg of the roundabout to provide a protected crossing between the bus stop and Northern Illinois University’s Disability Resource Center. Extensive coordination with Northern Illinois University was necessary, given that the project is located within the school campus. A Public Meeting was conducted to disseminate information to the public about the improvements.
SPRINGFIELD
3085 Stevenson Dr., Ste. 201
Springfield, IL 62703
P: 217.546.3400